爽灬爽灬爽灬毛及A片_国产做A爱片久久毛片A片古代_国产棈品久久久久久久久久免费看 _yellow高清在线观看免费观看视频

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標(biāo)題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


和硕县| 观塘区| 息烽县| 水富县| 南川市| 常熟市| 邛崃市| 西青区| 漳浦县| 灵宝市| 道孚县| 离岛区| 环江| 正宁县| 阜城县| 克拉玛依市| 获嘉县| 武义县| 鄂托克旗| 土默特左旗| 扬州市| 达尔| 朔州市| 高清| 从江县| 东源县| 姜堰市| 陇南市| 新宁县| 玛多县| 五大连池市| 海盐县| 祁东县| 肃南| 迁西县| 黄浦区| 曲阜市| 九寨沟县| 浑源县| 天台县| 建瓯市|